Veeam Disaster Recovery Orchestrator – Creating the plan

We have arrived at the latest article on Veeam Disaster Recovery Orchestrator version 5.

In this last part, we will concentrate on the efforts made previously and available on this site, to implement the Disaster Recovery Orchestration plan.

After logging in, the dashboard illustrates the status of the completed plans (image 1).

Picture 1

Note that, unlike the previous VDrO version, it is possible to filter planes based on “scopes” (image 2).

picture 2

A second and very useful novelty of version 5 is the presence of the inventory items (image 3), where the VM Groups are reported.

This option immediately verifies that in the chosen “scope” there is the group of VMs that will implement the DR plan.

Picture 3

Image 4 shows the details of the Orchestration plans already created.

Picture 4

Let’s see now how to create a plan:

From the manage, menu selects the New item (image 5).

Picture 5

And continuing with the wizard, we enter a name (image 6), the scope (image 7), and the type of floor (image 8).

Picture 6

Picture 7

Image 8

After adding the VM group to be orchestrated (image 9, 10 and 11)

Image 9

Image 10

Image 11

It is possible to customize the Recovery options, (for example whether to process the VMs in parallel or sequential mode) (image 12).

Image 12

Now I add the steps necessary for the realization of the plan (in the example the shutdown of the production VM was added as the first activity of the plan) (see images 13, 14, 15, and 16).

Image 13

Image 14

Image 15

Image 16

The wizard ends with:

  • The option to backup the VMs that were started during the DR plan (image 17)
  • The RTPO values that must be respected for the plan to be executed (image 18)
  • The choice of the language of the template to be used (image 19)
  • The time at which the reports will be automatically generated (image 20)
  • Whether to immediately create the readiness report (which verifies all components of the plan) (image 21)

image 17

image 18

image 19

image 20

image 21

Now you can test and start your orchestration plans later

Veeam Dr Orchestrator v.5: VONE – Tagging

Today we will show how to tell Veeam Disaster Recovery Orchestrator which resources to use to start a Disaster Recovery plan.

Before reading this article, we suggest you read the previous article ( by clicking here ) which allows you to check the status of the VDrO Server.

The main tool of asset labeling is Veeam One, which is installed by default with the Veeam Disaster Recovery Orchestrator v.5.

The procedure is very simple:

After connecting via RDP to the VDrO Server select Veeam One Client on the desktop (see Figure 1)

Figure 1

After selecting the Business View item (bottom left), the resources to be labeled are:

  1. Clusters: this item identifies the Disaster Recovery and production vCenter resources (Figure 2)
  2. The DataStores: this item identifies the disk areas where the VMs will reside once turned on (Figure 3)
  3. Virtual Machines: this item identifies the VMs that guarantee service continuity in the event of a Disaster (Figures 4 and 5).

Figure 2

Figure 3

Figure 4

Figure 5

Note 1 : The replication jobs have been configured on the embedded VBR of the VDrO server (see figure 6)

Figure 6

Note 2 : The tagging operation is discussed in a previous post available at the following link:

https://lnx.gable.it/home-page/veeam-availability-orchestrator-v-3-0-dr-from-replicas/

That’s all for today, see you soon!